Fig. 3Avoiding Smoke and Odors - Negative Pressure, Shut-down and Electrical Power Failure.To reduce the probability of back-drafting or burn
Venting4” Type “L” or “PL” Vent pipeThis is the minimum venting conguration.Fig. 5-Fig. 4+The minimum vent conguration is a 90o or Tee on
Chimneys taller than 20’ above the connection will require a draft test to determine if the draft is too high.Note: The h
Outside AirTo install outside air, use 2 3/4” I.D.galvanized steel ex pipe, part # 2-00-08544 ( 12’ 6” length) or part # 2-00-08545 ( 25’ length)
To install power to the boiler, rst remove the cover on the 4” X 4” junction box located on the back of the unit. There are
Installing Duct
Installing Duct/Air ConditioningBoilers intended to be connected to an existing boiler or boiler system shall:1. Be capable of being ins
NOTE: ALWAYS REFER TO THE INDIVIDUAL COMPONENTS RECOMMENDED INSTALLATION INSTRUCTIONS FOR THE PROPER MOUNTING POSITION AND LOCATION WITHIN THE PIPIN
* PRESSURE RELIEF VALVE* TEMPERATURE/PRESSURE GAUGEAIR VENTTYPICAL BOILER HOT WATER PIPING SHOWING AIR REMOVAL SYSTEM, PROVISIONS FOR TH
MINIMUM OF 72" OF 3/4" FINNED BASEBOARD(HIGH TEMPERATURE) BASEBOARD HEATSYSTEM RETURN SHUT-OFF VALVENOTE: ALWAYS R
Draft Bolt LocationViewing WindowAir wash SlotFirebox DoorFig. 9“Test”Low Draft Adjustment PotFig. 10Fig. 11CoveredUn-CoveredAir Wash S
Fuel and Fuel StoragePellet fuel quality can uctuate from manufacturer to manufacturer, and even from bag to bag. Hearth & Home Technologies re
Power LightIndicates power to the control board.Status LightWill be lit anytime there is a call for heat.Combustion Blower LightIndicate
Control Board Operation Aquastat Sensor - This sensor is located in the aqua-stat well on the top of the water jacket. This sensor along
1. Turn Mode Selector to “OFF”.This resets the control in addition to turning it off.Starting A Fire Automatically3. Fill Hopper with pelle
4. If Starting After an Empty Hopper, Turn Feed Adjuster to “TEST” (for one 60 second cycle). This will feed pellets into the auger tube and
8. Turn the MIN. TEMP. Dial on the control board to the desired Minimum temperature. This will start the lighting process if the temperature at the
NOTE: Stirring the starting gel into the pellets usually allows the re to become established quicker.CAUTION: A vapor ash could occur
Hopper Lid LatchesHopper Control Board CoverControl BoardCombustion BlowerCombustion Blower CoverTemperature / Pressure GaugePressure Relief ValveAqu
Fig. 18Burnpot Cleaning: The burnpot should be cleaned no less than once a week. For best operation the burnpot should be cleaned every time the hop
Fig. 21Ash Door HandleAsh DoorAsh PanAsh Pan HandleAsh RemovalIt is recommended to remove the ashes when the boiler is not in operation.
CleaningThis cleaning should be done after each ton of pellets used. The frequency of this cleaning will be directly related to
The boiler MUST be OFF and COOL before you should attempt to clean the combustion blower.The wire to the combustion blower doesn’t need
BTU Input Range= 0, and 9350 to 113,900*0 BTU if system is satised.Min. Burn = 1.1 pound per hourMax. Burn = 13.4 pounds per hour* 850
GREEN/YELLOWDARK BLUE PELLET BOILER WIRING DIAGRAM4" SQUARE JUNCTION BOXBLACKGREEN/YELLOWWHITEREDREDWHITEGREEN3/8"FLEX CONDU
“105 Series” PELLET BOILERWHITEGREENRelay enclosure box -GRAINGER # 1EGH7REDREDWHITEGREENDPDT RELAY flange mtd. -GRAIN
WoodHearth & Home Technologies, Inc.WARNING: Risk of fire - Do not operate with the flue draft exceeding -.9 in Water Col
Date Of Service Performed By Description Of Service
Proudly Printed On 100% Recycled Paper
1 Turn Mode Selector to OFF.2 Use heat exchanger cleanout rods to clean the heat exchanger tubes.**3 Scrape the air holes in the burnpot.**4 Fill
At Harman, we build each product to a standard, not a price.This powerful heating appliance boasts uncompromising attention to detail and hel
ECO-CHOICE™ LIMITED WARRANTYHearth & Home Technologies Inc., on behalf of its Heatilator® brand (”HHT”), extends the following warranty f
Boiler Kit Materials: (Refer to page 2)List of items contained within the boiler kit shipped with the unit. 1 - Control board cover 1 - Acc
Design:The rst thing that needs to be done is deciding where and how the boiler will be installed.Things that need to be taken into considera
NOTE: All installation clearances and restrictions must be adhered to.INSTALLATION IS TO BE PERFORMED BY A QUALIFIED INSTALLER.NOTE
Requirements for Terminating the VentingWARNING: Venting terminals must not be recessed into a wall or siding.NOTE: Only PL vent pipe wall pass-throu